reference

Contract for the retrofit of a generator output
11.5 kV, 60 MW

December 2020

The twentieth increase in gas turbine capacity at the GTHWK Halle requires an adjustment to the generator output to accommodate the increased current-carrying capacity.

At the same time, the generator is to be equipped with its own circuit breaker. The generator output itself is designed as a special construction. In advance of a possible contract award, E&A developed a concept for the upgrade and expansion of the generator output.

Machine outlet panel

We have now been awarded the contract for the complete package. The scope of our contract includes:

  • Development of an overall concept
  • Dismantling of the generator outlet
  • Reengineering and 3D-CAD modeling of the generator outlet design
  • Design of the generator outlet in accordance with all criteria of IEC 62271-200
  • Calculation of the overpressure curve in the event of an internal fault in the housing
  • Stress simulation of the housing using software
  • Conversion and expansion of the secondary protection, including synchronization
  • Mechanical modification and expansion of the generator lead housing
  • Electrical disassembly and testing of the generator lead at the E&A plant
  • Reassembly of the generator lead
  • Secondary protection testing and transformer testing
A detailed design plan for GTHKW Halle

View 1

Techniacl design plan for machine discharge at the GTHKW plant

View 2

Technical design plan for machine discharge at the GTHKW plant

View 3

Get in touch with us!

E&A Elektrotechnik und Automatisierung GmbH

Gewerbering 5 | 01809 Dohna

F&S PROZESSAUTOMATION GmbH

Gewerbering 35 | 01809 Dohna

Back to the news overview